Here is a list of some of the projects in your area.
1. Arlington County – Replacement of the lower athletic field at Thomas Jefferson Community Center – Replacement of current stone dust turf with synthetic infill type turf system, replacement of existing field lighting – Pre-Bid Meeting is going to be 11am September 3rd, 2009.
2. Phase Two of Marley – Jumpers Sewer Rehabilitation – $2,000,000.00$3,000,000.00 Project. 15in -8 in sanitary sewer pipe installation as well as low pressure pipe, grinder pumps, 30 manholes, house laterals,and paving restoration.
3. Lehman’s Mill Road Stream Bank Stabilization – Stabilization of eroding stream banks along Antietam Creek, removal of trees, placement of rip-rap and class II rip rap, road pavement (full depth), installation of traffic barrier, and embankment stabilization with grasses, live stakes, fascines, and trees. Bids Due – 1pm on Sept. 23, 2009.
Don’t worry we have more construction projects for our customers to review.
To all of our Readers here are some of the most popular projects that will be starting soon.

